top of page
Network 3 (1).png

Keoma Energy is working to deploy up to £1bn of investment in the UK’s road freight network by 2035, with 20-30 sites either live, in development or in scope. 

Keoam UK Network Map.png

Keoma Energy’s UK Network:

Lutterworth

Bays: 179

Charge points: 32 (8 x 400kW + 24 x 200kW)

Grid Connection: 4.5MW

Security standard: TAPA PSR lv. 2

Corby

In Development

Bays: 120

Charge points: 32 (8 x 400kW + 24 x 200kW)

Grid Connection: 5MW

Security standard: TAPA PSR lv. 2

Avonmouth

In Development

Bays: 230

Charge points: 32 (8 x 400kW + 24 x 200kW)

Grid Connection: 6MW

Security standard: TAPA PSR lv. 2

Doncaster

In Development

Waterside

​

Bays: 210

Charge points: 32 (8 x 400kW + 24 x 200kW)

Grid Connection: 5MW

Security standard: TAPA PSR lv. 2

Warrington

In Development

Bays: 130

Charge points: 32 (8 x 400kW + 24 x 200kW)

Grid Connection: 5MW

Security standard: TAPA PSR lv. 2

Glasgow

In Scope

Bays: 150

Charge points: 32 (8 x 400kW + 24 x 200kW)

Grid Connection: 6MW

Security standard: TAPA PSR lv. 2

bottom of page