top of page
.png)
Keoma Energy is working to deploy up to £1bn of investment in the UK’s road freight network by 2035, with 20-30 sites either live, in development or in scope.

Keoma Energy’s UK Network:
Bays: 179
Charge points: 32 (8 x 400kW + 24 x 200kW)
Grid Connection: 4.5MW
Security standard: TAPA PSR lv. 2
Corby
In Development
Bays: 120
Charge points: 32 (8 x 400kW + 24 x 200kW)
Grid Connection: 5MW
Security standard: TAPA PSR lv. 2
Avonmouth
In Development
​
Bays: 230
Charge points: 32 (8 x 400kW + 24 x 200kW)
Grid Connection: 6MW
Security standard: TAPA PSR lv. 2
Doncaster
In Development
​
Bays: 210
Charge points: 32 (8 x 400kW + 24 x 200kW)
Grid Connection: 5MW
Security standard: TAPA PSR lv. 2
Warrington
In Development
Bays: 130
Charge points: 32 (8 x 400kW + 24 x 200kW)
Grid Connection: 5MW
Security standard: TAPA PSR lv. 2
Glasgow
In Scope
Bays: 150
Charge points: 32 (8 x 400kW + 24 x 200kW)
Grid Connection: 6MW
Security standard: TAPA PSR lv. 2
bottom of page
